Risk Assessment

Production Title: Music video //Unit 9 Digital editing

Director: Donelle Karikari-Senkyere
Crew: Stacey Johnson, Blessing Anakambi, Donelle Karikari-Senkvere

Address of shoot: Essex Rd, Leyton, London E10 6EQ & London E20 2ST

Date: 17/05/2017

The following potential risks / hazards might be present:

 Tripping hazards         low lighting     adverse weather / temperatures      

Electrical cords and sockets      Fatigue

Risk / Hazard identified
People affected
Existing controls
Action to be taken to reduce risk or hazard
 
Tripping hazards
 
Crew/Director and music artist (Dsuaves)
 Safety first.
 Cables will be taped to the ground and out of sight to anyone that it may harm.
 
Low lighting

 Music artist
 There will be lighting placed in the TV studio and we will use natural lighting when outside therefore we will be filming during the day.
 The footage taken on the various dates may not be seen due to low lighting therefore we will make sure that we use artificial lighting and make sure that we film during 1pm-6pm to ensure that it is light enough for the music artist to be seen within the footage.
 
 Adverse weather/temperatures
 
 Crew/Director and music artist
 Weather news.
 We will check the weather before stepping out to begin filming just in case there are any signs of a storm or rain.
 
 Electrical cords and sockets
 
 Crew/Director and music artist.
 
--------------------------------
 As there can be a power cut or someone could harm themselves by getting a electric shock we will have attire that is suitable for the energy running in the electrical cords and sockets and make sure that the weather is suitable as power cuts can be caused by weather.
 
 Fatigue
 
 Crew/Director and music artist
 Set times for them to sleep
 Everyone will have a set time to sleep to make sure they get at least a 12hour sleep before filming so they have enough energy for the next day.
 
 
 
 
 
 
 
 
 
 
 
 